EPS Block Production in Bozhou
- Project: production of homogeneous EPS self-insulation concrete blocks
- Time: contract signed on 15th October 2021, project started in May 2022
- Location: Bozhou, Xinjiang, China
- Production output: 300-400m³ per day
Project outcome: installation and commissioning took one month, with technical training completed in one week. Initial production exceeded 200m³ per day, reaching the target output within one week. The cutting accuracy met expectations, and the customer was satisfied.